Before the exclusive COC-1 form can be processed, the applicant must satisfy a strict set of prerequisites. Failure to meet these results in immediate rejection.
The COC 1 Form serves as the first formal step in obtaining regulatory approval for a construction project. It confirms that the proposed development conceptually complies with zoning, land-use, and basic safety requirements. Early submission allows the regulator to identify major issues before detailed design work proceeds, reducing costly revisions later. trakhees coc 1 form exclusive
Before filling out the form, ensure you have: Before the exclusive COC-1 form can be processed,
✅ Approved building permit from Trakhees
✅ Approved shop drawings & material approvals (Green/Amber tags)
✅ All NOCs from relevant authorities (DEWA, Civil Defence, RTA, etc.)
✅ As-built drawings ready (if requested by inspector)
✅ Test reports (e.g., pressure tests for plumbing, megger test for electrical, fire alarm loop tests)
✅ Third-party safety certificates (e.g., for elevators, gas systems, lifting equipment) pressure tests for plumbing