| Element | Gemeten tijd (centimin) | |----------|-------------------------| | Pakken behuizing | 1.2 | | Brengen naar montageplek (30 cm) | 2.5 | | Pakken schroef M4 | 2.1 | | Plaatsen schroef in gat | 3.5 | | Handmatig schroeven M4 | 11.0 | | Denktijd: controleren of juiste gaten | 4.5 | | Subtotaal basis | 24.8 centimin | | Toeslag 15% (verdeeltijden) | 3.7 centimin | | Eindtijd per product | 28.5 centimin = 0.285 min = 17.1 sec |
Gustav Ende was a German engineer and pioneer in time and motion study (German: Arbeitsstudien). His work predates but parallels the developments of Frank and Lillian Gilbreth (Therbligs) and later Methods-Time Measurement (MTM). The “Tabel Montage Tijden” refers to a system of pre-determined time values for basic assembly elements such as pakken (grasp), brengen (move), voegen (join), schroeven (screw), and niet-en (rivet/press fit).
Body sizes, strength norms, and lighting levels have changed. Today’s workers may move faster but require different ergonomic allowances.
No system is perfect. The Gustav Ende method had several shortcomings that eventually limited its use.
De "Tabel Montage Tijden Conform Gustav Ende" is meer dan een historisch artefact. Het is een waarschuwing en een blauwdruk. Het leert ons dat precisie en menselijkheid elkaar niet hoeven uit te sluiten – mits de tabel wordt gebruikt als een diagnose-instrument, niet als een zweep. TABEL MONTAGE TIJDEN CONFORM GUSTAV ENDE
Endes grootste inzicht blijft actueel: Een vertraging is bijna nooit luiheid, maar altijd een signaal van een suboptimaal proces.
“Die Tabelle lügt nicht. Der Arbeiter lügt nicht. Nur das Chaos lügt.”
— Gustav Ende, Montage und Moral (1932)
Dit artikel is een reconstructie op basis van de principes van industriële optimalisatie. Gustav Ende is een pseudoniem voor een stroming in de vroege Duitse arbeidsstudie.
Tabel Montage Tijden Conform Gustav Ende (Gustav Ende Assembly Time Table) is a long-standing reference used in the Dutch installation industry to estimate the labor time required for technical projects. Key Characteristics Experience-Based “Die Tabelle lügt nicht
: The norm times are based on historical experience and practical data rather than theoretical time-motion studies. Ploegminuten
: Times are expressed in "team minutes" (ploegminuten) rather than individual man-hours, often used for calculating crew-based work. Applications : It is primarily used for cost calculation capacity planning
, and determining delivery times for electrical, mechanical, and sanitary installations. Calculation Factors
: The method includes correction factors for specific site conditions, logistics, and assembly techniques. Modern Context Dit artikel is een reconstructie op basis van
While once a primary standard, the Gustav Ende method is increasingly being replaced or supplemented by the Techniek Nederland Calculatiemethode
. Critics of the Ende method note that its standards are not "labor-scientifically" supported and lack clarity regarding modern tools and methods. Accessing the Table
This concept originates from classical work measurement and predetermined motion time systems (PMTS), specifically the German system REFA and the foundational work of Gustav Ende in the early 20th century.
The table gives a single standard time. It does not account for the steep improvement in cycle times during the first hours/days of production (the learning curve).
Anyone who learns the Gustav Ende table will immediately grasp the logic behind MTM, MOST, and even time study. It is an excellent teaching tool for vocational schools and engineering courses on work measurement.
| No. | Element | Code | |-----|---------|------| | 1 | Reach from radio chassis to tube bin (30 cm) | H-30 | | 2 | Grasp one tube | G-simple | | 3 | Move tube from bin to socket location (45 cm) | B-45 | | 4 | Guide tube pins into socket holes | F-precise | | 5 | Insert tube with slight push (snap) | Z-snap | | 6 | Release hand | L |