Navigating Saudi Aramco’s Schedule G: A Guide to Materials & Equipment If you are a contractor working with Saudi Aramco
, you know that their contracts are built on a series of specialized "Schedules." Among these, Schedule G
is one of the most critical documents for project managers and procurement teams Essentially, Schedule G serves as the rulebook for Materials, Tools, and Equipment
. Whether you are providing the steel yourself or receiving it from
, this schedule dictates exactly how those assets must be managed. What is Saudi Aramco Schedule G? saudi aramco schedule g
Schedule G is a mandatory contract attachment that outlines the policies for managing physical project assets. It draws a clear line between what the "Company" (Aramco) provides and what the "Contractor" must supply. Key Components of Schedule G
The document is typically broken down into several sections and attachments that specify responsibilities: Company-Supplied Materials (Attachment I):
Aramco often provides long-lead items or specialized materials (like large-diameter steel pipe) at no cost to the contractor. Contractors are responsible for safeguarding and properly storing these items once received. Contractor-Supplied Materials:
For everything not on the "Company-Supplied" list, the contractor is responsible for procurement, transportation, and duties. In-Kingdom Preference: A major focus of Schedule G is the preference for Saudi manufacturers, vendors, and carriers Navigating Saudi Aramco’s Schedule G: A Guide to
. Using local resources isn't just encouraged; it's often a contractual requirement to support the local economy. Reporting & Management:
Contractors are usually required to implement a material management system and issue monthly reports on the status of all supplied materials. Why It Matters for Your Project Understanding Schedule G is vital for two main reasons:
Schedule G: Contractor Responsibilities | PDF | Procurement - Scribd
Saudi Aramco’s Schedule G dictates material management, procurement, and technical standards for contractors, emphasizing compliance with Saudi quality standards and local procurement. In offshore contexts, it specifically covers rigorous upgrades for helidecks, piping, and mooring gear, often requiring specialized shipyard support to meet Aramco Marine Department requirements. Further technical details can be reviewed in the Scribd document. Offshore Drilling Rig ADM-683 Specifications | PDF - Scribd Before diving into the clauses, one must understand the "why
4.1 Current mooring arrangement provided by the Saudi Aramco Marine. department or Marine approved equivalent. – Mansoor – B/E in. Aramco Schedule G: Material Management | PDF - Scribd
Before diving into the clauses, one must understand the "why." Saudi Arabia’s oil infrastructure is the world’s most targeted industrial asset. A single fire, explosion, or oil spill is not a local news story; it is a geopolitical event that moves global markets.
Between 2000 and 2010, Aramco recognized that third-party contractors, who often cut corners on safety to reduce bids, were the weakest link in their operational chain. Schedule G was overhauled to eliminate that weakness. Today, the schedule exists to achieve three specific goals:
Even though these are general materials, Aramco’s Vendor Inspection Group (VIG) may assign a Cat-III or Cat-IV inspection level.