Fidic Blue Book 2016 Pdf (2027)
If you are an engineer, contractor, or employer working on a dredging project:
Complete the Forms (Part 3) – Use the Tender form, Agreement, and securities exactly as shown, or your contract may be unenforceable under some legal systems.
Integrate with other documents – The Blue Book assumes you also have: fidic blue book 2016 pdf
Use FIDIC’s official guidance books – Consider purchasing "FIDIC Users' Guide to the Blue Book 2016" (separate publication).
Q: Is there a 2017 or 2020 version of the Blue Book?
A: No. The 2016 edition is the only and current version (1st Edition). FIDIC has not issued an update as of 2026. If you are an engineer, contractor, or employer
Q: Can I use the Blue Book for a land-based earthmoving project?
A: Not recommended. Use the Red Book instead. The Blue Book’s tidal/discharge clauses are irrelevant on land.
Q: Does the PDF allow printing or copying clauses?
A: The official FIDIC PDF allows printing for internal use but restricts copying/pasting and editing. Complete the Forms (Part 3) – Use the
Q: Where can I get free training or sample clauses?
A: FIDIC occasionally publishes sample clauses in conference papers. Search FIDIC’s official YouTube channel or event archives.
Before 2016, dredging and reclamation projects often relied on a modified version of the FIDIC Green Book (Short Form) or bespoke government contracts, which frequently led to disputes. The need for a contract tailored specifically to the unique risks of dredging (e.g., unforeseen ground conditions, variable volumes, environmental sensitivity) led FIDIC to publish the 1st Edition of the Blue Book in 2016.
The Blue Book replaced the earlier Form of Contract for Dredging and Reclamation Works (2nd Edition, 2006)—which was actually a separate document often confused with the test version. The 2016 edition is the current, authoritative version.
This is the heart of the 2016 update. If the Contractor encounters physical conditions that are unforeseeable (i.e., could not have been predicted by an experienced contractor on the date of tender despite examining all provided data), the Contractor is entitled to an extension of time and cost recovery.