logo ASAP Utilities

Receive our newsletter

Get an email when a new version of ASAP Utilities is released

RSS Feed

The new version will be announced in our news RSS feed.

Below are practical, prioritized improvements for teams deploying or optimizing EPLAN Electric P8.

  • Invest in training and onboarding

  • Optimize project structure and data management

  • Automate with macros and scripting

  • Integrate with enterprise tools

  • Improve hardware and IT setup

  • Enforce quality checks and validation

  • Customize reports and BOMs

  • Vendor and part library management

  • Plan upgrades and compatibility

  • Version 2.9 introduced dynamic macros (e.g., a macro for a contactor that asks for “rated current” upon insertion). Build a library of 50 such macros to reduce design time from days to hours.

    Older versions (2.7 and earlier) relied on classic dropdown menus. Version 2.9 introduced a fully customizable ribbon interface, similar to Microsoft Office.

    Use Project > Utilities > Check Project. In v2.9, this tool now finds potential wire numbering conflicts, duplicate device tags, and missing part numbers—saving you from costly workshop errors.




    Home Privacy Policy Cookie Policy EULA Download All added Excel tools Sitemap Contact Us

    Eplan Electric P8 29 Full Better (2024)

    Below are practical, prioritized improvements for teams deploying or optimizing EPLAN Electric P8.

  • Invest in training and onboarding

  • Optimize project structure and data management

  • Automate with macros and scripting

  • Integrate with enterprise tools

  • Improve hardware and IT setup

  • Enforce quality checks and validation

  • Customize reports and BOMs

  • Vendor and part library management

  • Plan upgrades and compatibility

  • Version 2.9 introduced dynamic macros (e.g., a macro for a contactor that asks for “rated current” upon insertion). Build a library of 50 such macros to reduce design time from days to hours.

    Older versions (2.7 and earlier) relied on classic dropdown menus. Version 2.9 introduced a fully customizable ribbon interface, similar to Microsoft Office.

    Use Project > Utilities > Check Project. In v2.9, this tool now finds potential wire numbering conflicts, duplicate device tags, and missing part numbers—saving you from costly workshop errors. eplan electric p8 29 full better