Each price entry typically includes:

The database is divided into thematic chapters by type of work or material, similar to standard Spanish construction price databases (like the CIM or the Generalitat’s BEDEC), but customized for railway infrastructure.

Main sections typically include:

| Chapter | Description | |---------|-------------| | 01 | Demolitions and clearing | | 02 | Earthworks and geotechnics | | 03 | Drainage and pavements | | 04 | Tunnels and underground structures | | 05 | Bridges and viaducts | | 06 | Track (rails, sleepers, ballast, switches) | | 07 | Electrification (catenary, substations) | | 08 | Signaling, interlocking, ERTMS (European Rail Traffic Management System) | | 09 | Telecommunications and control systems | | 10 | Safety and protection systems | | 11 | Stations and buildings | | 12 | Environmental integration | | 13 | Health and safety | | 14 | Waste management |

Each line item has a code (e.g., 06.01.001), description, unit of measure (m, m², m³, unit, kg, etc.), and a net price (€).

Si usted es un ingeniero de caminos, arquitecto o jefe de proyecto, aquí tiene un flujo de trabajo práctico:

Paso 1: Obtener la base oficial Descargue el archivo en formato PDF o Excel desde el portal de transparencia de ADIF o de la Plataforma de Contratación del Sector Público. Asegúrese de que es la versión de junio 2021 (o la actualización del cuarto trimestre, si existe).

Paso 2: Localizar la unidad de obra Busque por código o por descripción. Por ejemplo: "Suministro y colocación de carril UIC 60 en placa de hormigón".

Paso 3: Verificar la composición No use el precio neto sin más. Revise:

Paso 4: Aplicar coeficientes de actualización Los precios son de 2021. Para un presupuesto de 2025, debe aplicar el coeficiente de revisión de precios oficial del Ministerio de Transportes (generalmente basado en el IPC o índices sectoriales).

Paso 5: Preparar la oferta En una licitación, usted puede usar los precios de la BBPP 2021 como precio de salida. Si ofrece una baja, debe justificarla sin comprometer la calidad (por ejemplo, mediante mejores procesos, no con materiales de menor calidad).

base de base de precios adif 2021
GET STARTED

Experience Seamless Design with Kimp

Schedule Demo cta-img
base de base de precios adif 2021

De Precios Adif 2021 — Base De Base

Each price entry typically includes:

The database is divided into thematic chapters by type of work or material, similar to standard Spanish construction price databases (like the CIM or the Generalitat’s BEDEC), but customized for railway infrastructure.

Main sections typically include:

| Chapter | Description | |---------|-------------| | 01 | Demolitions and clearing | | 02 | Earthworks and geotechnics | | 03 | Drainage and pavements | | 04 | Tunnels and underground structures | | 05 | Bridges and viaducts | | 06 | Track (rails, sleepers, ballast, switches) | | 07 | Electrification (catenary, substations) | | 08 | Signaling, interlocking, ERTMS (European Rail Traffic Management System) | | 09 | Telecommunications and control systems | | 10 | Safety and protection systems | | 11 | Stations and buildings | | 12 | Environmental integration | | 13 | Health and safety | | 14 | Waste management |

Each line item has a code (e.g., 06.01.001), description, unit of measure (m, m², m³, unit, kg, etc.), and a net price (€). base de base de precios adif 2021

Si usted es un ingeniero de caminos, arquitecto o jefe de proyecto, aquí tiene un flujo de trabajo práctico:

Paso 1: Obtener la base oficial Descargue el archivo en formato PDF o Excel desde el portal de transparencia de ADIF o de la Plataforma de Contratación del Sector Público. Asegúrese de que es la versión de junio 2021 (o la actualización del cuarto trimestre, si existe). Each price entry typically includes: The database is

Paso 2: Localizar la unidad de obra Busque por código o por descripción. Por ejemplo: "Suministro y colocación de carril UIC 60 en placa de hormigón".

Paso 3: Verificar la composición No use el precio neto sin más. Revise: Paso 4: Aplicar coeficientes de actualización Los precios

Paso 4: Aplicar coeficientes de actualización Los precios son de 2021. Para un presupuesto de 2025, debe aplicar el coeficiente de revisión de precios oficial del Ministerio de Transportes (generalmente basado en el IPC o índices sectoriales).

Paso 5: Preparar la oferta En una licitación, usted puede usar los precios de la BBPP 2021 como precio de salida. Si ofrece una baja, debe justificarla sin comprometer la calidad (por ejemplo, mediante mejores procesos, no con materiales de menor calidad).