If you need this as a downloadable Excel/CSV, API-ready JSON, or interactive map embed code, let me know — I can generate that exclusively for your platform.
Amaravati Inner Ring Road (IRR) is a critical infrastructure project designed to provide high-speed connectivity within the Andhra Pradesh capital region. Spanning approximately 96.25 to 97.5 kilometers with a width of 75 meters, the IRR is set to pass through 41 villages across 10 mandals in the Guntur and Krishna districts. The project is structured in two primary phases: Phase 1 (67.57 km) stretching from Kethanakonda to Nunna, and Phase 2 (28.68 km) completing the circular corridor back to Kethanakonda. Exclusive List of Villages by Mandal
The following villages are directly along the proposed Inner Ring Road route:
The 41 villages identified for the project are distributed across two districts: Guntur District (17 Villages): Areas covered include key points in Mangalagiri , and Thullur mandals, such as Vykuntapuram Ananthavaram Krishna District (24 Villages): Included are locations within G. Konduru Gannavaram Ibrahimpatnam Penamaluru , and Vijayawada Rural mandals, including key nodes like Ibrahimpatnam Project Phase Details Phase 1 (28 Villages):
This initial phase focuses on the 67.57 km stretch connecting major points like Kethanakonda, Vaddamanu, and the areas surrounding Penamaluru
Covers the remaining sections to complete the 28.68 km circuit, connecting regions such as , Pathapadu, and Ibrahimpatnam Recent Developments amaravati inner ring road villages list exclusive
As of early 2026, the state government is advancing the IRR project via a Public-Private Partnership (PPP) model
. Land acquisition is a priority, with Phase 1 completion targeted in the coming months, followed by a 24–30 month construction timeline.
For a complete, in-depth look at all 41 villages and official route maps, please refer to the documents referenced here. for affected farmers or the specific layout roads connecting to the IRR?
The Amaravati Inner Ring Road (IRR) is a critical 96.25 km circular infrastructure project designed to provide high-speed connectivity within the Andhra Pradesh Capital Region. It passes through approximately 41 villages across several districts, including Guntur, Krishna, Palnadu, and NTR. Key Villages Along the Route
The IRR, designed to connect major urban nodes, passes through several key villages across various mandals, including (Ananthavaram, Vaddamanu), Mangalagiri (Chinavadlapudi, Kaza), Amaravathi (Vykuntapuram), (Mothadaka), Ibrahimpatnam (Kethanakonda, Kondapalle), Penamaluru (Poranki), and Gannavaram (Vedurupavuluru). Project Phases and Technical Specs The 96.25 km project is executed in two phases: If you need this as a downloadable Excel/CSV
Phase 1 (67.57 km): Connects Kethanakonda to Nunna, passing through 26 villages including Vaikuntapuram
Phase 2 (28.68 km): Completes the loop from Nunna back to Kethanakonda.
The project features a 75-meter Right of Way (ROW) and an 8+4 lane configuration, aiming to significantly enhance connectivity.
Here’s a feature idea for "Amaravati Inner Ring Road Villages List Exclusive" — designed as a premium, data-rich tool for real estate investors, developers, and local residents.
| Filter | Options | |--------|---------| | Segment | Eastern (12), Southern (10), Western (9), Northern (8) | | Land acquisition status | Complete (24), Partial (28), Not started (11) | | Growth potential | High (near junction), Medium, Low | | Zone type | Residential, Industrial, Mixed-use, Agriculture transition | | Distance to core capital | <5 km, 5–10 km, >10 km | | Filter | Options | |--------|---------| | Segment
These villages will have on-ramps/off-ramps. Land here has zoning potential for gas stations, malls, and logistics.
To verify if your specific survey number (not just village) falls under the IRR alignment, follow these steps (Exclusive insight):
Important Note: The exact alignment is subject to final gazette notification by CRDA. This list is based on the master plan, tender documents, and recent land surveys (2023–2025) . The IRR is a 65–70 km corridor encircling the core capital city.
Not every village on the list gets the same benefit. Here is the exclusive differentiation:
